Western Stabilization worked with the Rolling Hills Casino in Corning, Ca. to foam asphalt recycle it’s 80,000 sq. ft. entrance roadway. This was a total reconstruction completed in 5 days! It was foam recycled, the entrance dug-out, reshaped, and finished paved all in 5 DAYS!. There was minimal disruption and the access to the casino was kept active 100% of the time. The casino didn’t lose one customer. Now that is road construction at it’s best.

Job Info:

80,000 sq. ft @ 8″ depth with 3% oil and 4 lbs. per sq. ft. Additive (bag-house dust) Foamed Asphalt Recycled in 1 Day!