Making the Earth
More Stable

Our Projects

Our Projects

Soil Stabilization

Mountain House community plan header

Mountain House

Moisture treating over 10,500,000 square feet! That’s right over 10.5 MILLION SQ FT. Western Stabilization is helping turn the dream of this new planned city Mountain House into a reality. 10,500,000 square feet at 12 inch depth, treating the soil to 4 percent over optimum.

Muddy construction site with traffic cones

Cordelia Scales Lime Stabilization

Western Stabilization working with OC Jones in the reconstruction of the Cordelia Scales. The Interstate 80 Eastbound Cordelia Truck Scales Relocation Project in Fairfield will reconstruct and modernize the existing eastbound Cordelia Truck Scales Facility. The project will also include the construction of a four-lane bridge across Suisun Creek and new braided on and off…

Road milling machine next to water truck

Davis Test Sections

The test section was complete by the donation of Equipment and Time by Western Stabilization and Teichert Construction, UC Davis furnished all binding products. All test sections where done at 13 inches depth, which consisted of 5 inches A.C. and 8 inches of 2 AB with a Soil Weight of 135. 5 inches of A.C.…

Winterization/Dry-up

Morgantown High School architectural rendering

New Dixon High School, Dixon,Ca.

Western has been been working on this new site for Dixon High School in Dixon,Ca. We as a company have used Quicklime to dry this site up as to keep the construction schedule on point. We are working hard to make sure your kids can attend a school on a strong foundation. We will stabilize…

Close-up of spreader wheel spraying material

West Sacramento California

Western Stabilization to perform a Soil Stabilization | Dry-Up in West Sacramento California. This job consisted of a single day Soil Stabilization | Dry-Up of the job site to a depth of 18” at 3% lime ratio. The contractor approved the incorporation of all existing vegetation in the Soil Stabilization | Dry-Up process. Compaction was…

Muddy jobsite with earthmoving equipment

Sports Authority Sacramento, Ca. Dry-Up

Western Stabilization – Our Winterization/Dry-Up of your site eliminates down-time. It allows you to go back to work and start construction just one day after the completion of the soil treatment. The beauty of our Winterization/Dry-Up is that it protects your site throughout the entire construction project. One treatment is all it takes. You can…

Asphalt Pulverization Recycling

Road milling machine spreading material on roadside

Road 102, Woodland

Western Stabilization working under Teichert Construction turned the dilapidated Road 102 near Woodland Ca. back to a usable base material. We Pulverized the existing AC and some of the Base and added cement. This Full Depth Reclamation job is an awesome example of recycling old roads. Why remove and replace when you can Pulverize and…

Overhead highway sign for Leisure Town Road

Leisure Town Exit

Western Stabilization has pulverized the Leisure Town freeway exit off of West Bound 80. The new overpass and Kaiser Hospital are great additions to this area. We turned the old exit back into re-usable base rock. Recycling saves our natural resources in more ways than one. Western pulverized 36,000 square feet at a depth of…

Street resurfacing equipment on neighborhood road

Asphalt Pulverizing in Petaluma, California

There’s NO down-side! Asphalt Pulverization Recycling saves the cost of excavating the old base, as well as the cost of importing new base materials. The options are simple. Bring in new aggregate at considerable cost or recycle your existing asphalt to create a new base at minimal cost. This job required a uniform pulverized mixture…

Foamed Asphalt

Cold planer working on sloped street

Hamilton City, Hwy 32

Western Stabilization performed the process of Foamed Asphalt Recycling in Hamilton City on Hwy 32. Under the watchful eye of Cal Trans we turned the old roadway into a new stronger road base! During the 3 nights in town and the 3 days outside of town Western Stabilization recycled the existing asphalt for an astonishing…

Road milling machine flanked by tanker trucks

Rolling Hills Casino in Corning, Ca.

Western Stabilization worked with the Rolling Hills Casino in Corning, Ca. to foam asphalt recycle it’s 80,000 sq. ft. entrance roadway. This was a total reconstruction completed in 5 days! It was foam recycled, the entrance dug-out, reshaped, and finished paved all in 5 DAYS!. There was minimal disruption and the access to the casino…

Nevada DOT Reno regional facility sign

Nevada NDOT

Western Stabilization working with Granite and Nevada Department of Transportation successfully foam asphalt recycled their maintenance yard in Reno. This is exciting for those in Reno and the surrounding area’s in Nevada. There is a great possibility that this recycling method could save Nevada’s valuable natural resources and save their public funds at the same…