Western Stabilization

There’s NO down-side!

Asphalt Pulverization Recycling saves the cost of excavating the old base, as well as the cost of importing new base materials. The options are simple. Bring in new aggregate at considerable cost or recycle your existing asphalt to create a new base at minimal cost.

This job required a uniform pulverized mixture that incorporated the full thickness (2”to 3”) of asphalt pavement and the underlying base for a total of 8”, that would provide an upgraded, homogenous base material for the Full Depth Reclamation.